Subordinate Service District - Assessment Rules
based on 6/27/01 meeting of the County Board of
Commissioners
Phase
1 rules
A. All
"buildable" lots are required to pay for a stub.
1 A "buildable" lot is defined as
one of the following:
(a) A 20,000 sf platted lot.
(b) A single platted lot of less than 20,000
sf.
(c) 20,000 sf divisions of contiguous lots
owned in common.
(i) Contiguous lots cannot be combined to avoid
assessment
(ii) Currently combined lots can be assessed for all
potential
B. Lots with non-conforming
systems must connect.
1) Seasonal cabins do not have to connect if
they:
(a) Do not have a well.
(b) Have a conforming holding tank.
(c) Install a conforming holding tank.
2) Lots with conforming systems may defer connection until the system
is
3) The point of enforcement for
non-conforming systems is:
(a) Point of sale
(b) Building permit
C. Phase 1 pays all costs
of the current project.
D. New homes built on assessed lots are required to install a CMSSD approved
pumping station
E. Lots in Phase 1 with non-conforming systems are not allowed to upgrade their
systems
Phase
2 rules
F. When connecting, Phase 2 lots pay same costs (adjusted for inflation)
as Phase 1, plus all
G. No new homes can be constructed in any part of Phase 2 without
extending and
H. Lots in Phase 2 with non-conforming systems will be considered on a
case-by-case
systems rather than